ECONOMIC CONSULTING ASSOCIATES

The objective of the assignment was to prepare a new Regional Generation and Transmission Expansion Plan (the so-called ‘Pool Plan’) for the SAPP region covering the period up to 2040. ECA led the project and provided inputs and expertise covering demand forecasting, economic aspects of power system planning, cost-benefit analysis and real-options analysis of major interconnection corridors and their associated generation projects.